Eligibility

Our Cooperation

We evaluate each farm based on technical and financial viability

Minimum Electricity Consumption

Required: Monthly electricity bill of at least 20M VND (or ~5,000 kWh/month)

Why: Smaller farms may not have sufficient load to justify system economics.

🏗️

Available Installation Space

Required: At least 300-500 sqm of suitable roof, pathway, or non-productive area

Why: Minimum space needed for cost-effective system sizing.

🏛️

Structural Integrity

Required: Roofs/structures capable of supporting 15-20 kg/sqm load (or can be reinforced)

Why: Safety and long-term stability.

🔌

Grid Connection

Required: Active EVN connection with sufficient capacity for net metering

Why: Solar4Shrimp is a grid-tied system.

📋

Legal Compliance

Required: Farm operating with valid business registration and land use rights

Why: Required for contract validity and permitting.

💼

Financial Stability

Preferred: Farm with demonstrated payment history (electricity, suppliers)

Why: Reduces BBE's credit risk on long-term service contract.